DNP Supernova Flex Installation Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
E11 Powering up (Plug in)
PRESS
to
BEGIN
Insert the plug of the IR receiver cable into
the mini-jack socket in the screen (located
next to the RS-232 socket). See below.
Place the infrared eye in the metal holder and
ensure good visible contact to the remote
control can be obtained.
Plug the power cord into the screen- and wall
sockets.
a. After plugging in the power cord,
press the House symbol to go to the
“Home page” then press [SN Flex] to
begin
13
Then
PRESS
then press [UP] on the remote
b. The screen calibrates by automatically
moving down 3” [76 mm] and then to the
top position.
c. Press [DOWN] and the screen will roll
down to the factory set bottom position.
d. If the screen is not in the top position when
plugging in, Press [UP] & the screen will
move down 3” [76 mm] and slowly back up
to the top.
e. There will be a delay before screen
movement occurs after pressing the
button.
f. See section F for setting a new bottom
position.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 23 24

Comments to this Manuals

No comments